Redevelopment of Ensuite at Silverpoint, Main Beach:Looking at window - After

Client: D & J Barry
Builder: Hawksley Constructions
Schedule: 8 weeks

{Click On Pictures To Enlarge}

The client required the total rebuilding of an existing bathroom using some of the finest materials available. 

The room was gutted to allow total renovation of the remaining shell. 

Looking at window - BeforeThe walls were lined, floor to ceiling, with AAA white thassos marble and the floors with blue pearl granite. All ceramic fixtures were white and the vanity unit and shaving cabinet were finished with a matching 2-pac paint. The protruding curved doors on the vanity provide an added feature. 

Looking at spa - BeforeMany difficulties were overcome mainly related to the installation of new wastes for the relocated shower and spa. This was exacerbated by the lack of access to the sub-floor area in the unit below. 

Looking at spa - AfterGlass was put to extensive use.  The entrance is framed with two sheets of  “artglass”, the shower screen is frameless toughened glass and mirrors on the shaving cabinet, which is fitted with glass  shelves, have bevelled edges. 

The completed ensuite is now in keeping with the existing high quality finishes throughout this sub-penthouse apartment.

 

Back Next

Hawksley Constructions Pty Ltd
 Director - Phillip Hawksley

Mobile      04 1934 2244
Phone      07 5575 3370
Fax
            07 5575 3371

 Email  web@hawksley.com

Mail
P.O. Box 67
Miami, Queensland  4220

A.C.N.          060 396 894
A.B.N.      50 060 396 894


Building Services Authority       79571
Master Builders Association      14434
Housing Industry Association      869259

 Legal & Privacy Statement
Legal/Privacy